Capital Projects
MENU
LOGIN
SEARCH
Menu Button
MENU
City Logo
Search Button
SEARCH

Projects Out to Bid

Plans and specifications may be downloaded (PDF format) at no-cost by clicking the respective link(s) below. Printed copies of the plans and specifications may also be purchased by written request to, or in-person at, the Office of the City Engineer. Contact information is shown to the right. Any applicable shipping charges are in addition to the stated cost. Payment for printed plans and specifications are non-refundable; check or cash only.

Contractors -- Race Neutral Measure Opportunities

The California Department of Transportation is offering, through the California Construction Contracting Program (CCCP), free training, counseling, and resources in order to assist small businesses to successfully bid and win Caltrans and Local agency construction contracts.

California Construction Contracting Program web site

New Public Works Contractor Registration Law [Senate Bill 854]

Beginning April 1, 2015, prime contractors and subcontractors bidding on public works projects will be required to be registered with the Department of Industrial Relations (DIR). Prime contractors and subcontractors will be required to submit certified payroll records to the Labor Commissioner using DIR's new data-driven electronic Certified Payroll Record (eCPR) reporting system. (DIR expects to have Phase I of this system deployed by early May of 2015. Contractors will be able input CPR data directly onto an online form or do a mass upload using an xml schema flat file).

Department of Industrial Relations (DIR) web site

Current Projects out to Bid


Well 8 GAC System Rehabilitation and Site Work

The work consists, in general, of rehabilitation of the existing GAC system at the Well 8 site, installation of a new well pump and VFD, installation of a new chlorine injection system, and installation of a nitrate monitoring system with a flush-to-waste option and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place.

City Project Number: 18-59
Bids Open: 12/6/2018
Engineer's Estimate: $0.00
Contractor License Required: A
Cost of Plans and Specifications: $450.00
Technical Contact: Stephen Fremming, Ph: 209-668-5417
Contact Email: sfremming@turlock.ca.us

View planholders list
Download plans and specifications
Print this project


Christoffersen Parkway Bicycle Improvements

The work consists, in general of: Remove existing striping, install new striping, minor concrete, and grind and pave asphalt, install bollards, pole mounted electrolier, and other associated work.

City Project Number: 16-58
Bids Open: 11/28/2018 10:00 AM
Engineer's Estimate: $309,000.00
Contractor License Required: A
Cost of Plans and Specifications: $60.00
Technical Contact: Randall Jones
Contact Email: Rjones@turlock.ca.us

Addenda:

Addendum 1 (3028.5 KB)

View planholders list
Download plans and specifications
Print this project


Intersection Improvements at W. Main and West Ave

The work consists, in general of: Install access ramps, hot mix asphalt, handwells, conduit, electrical boxes, loop detectors, and traffic signal system and other associated work. The work includes all necessary labor, materials, tools, equipment and any incidentals needed to perform the improvements as shown on the contract plans.

City Project Number: 16-59
Bids Open: 11/1/2018 10:00 AM
Engineer's Estimate: $280,000.00
Contractor License Required: A- General Engineering Contractor
Cost of Plans and Specifications: $40.00
Technical Contact: Randall Jones
Contact Email: RJones@turlock.ca.us

Addenda:

Addendum 1 (185.3 KB)

Supplemental Material:

Pre-Bid Sign in Sheet (384.9 KB)

View planholders list
Download plans and specifications
Print this project


Intersection Improvements at Lander Ave and F St

The work consists, in general of: install a traffic signal, storm drain improvements, minor concrete including curb and gutter, sidewalk, commercial driveway approach, and access ramps, and striping and signage, and other associated work.

City Project Number: 16-56
Bids Open: 10/31/2018 10:00 AM
Engineer's Estimate: $340,000.00
Contractor License Required: A - General Engineering Contractor
Cost of Plans and Specifications: $65.00
Technical Contact: Randall Jones
Contact Email: RJones@turlock.ca.us

Addenda:

Addendum 1 (270.6 KB)

Supplemental Material:

Pre-Bid Sign in Sheet (382.2 KB)

View planholders list
Download plans and specifications
Print this project


Intersection Improvements at Hawkeye and N. Denair

The work consists, in general, of: installation of new traffic signals and equipment including conduit, striping and signage and other associated work.

City Project Number: 16-57
Bids Open: 10/30/2018 2:00 PM
Engineer's Estimate: $318,000.00
Contractor License Required: A-General Engineering Contractor
Cost of Plans and Specifications: $30.00
Technical Contact: Adam Hutchings
Contact Email: ahutchings@turlock.ca.us

Addenda:

Addendum 1 (115.1 KB)

Supplemental Material:

Pre-Bid Sign in Sheet (382 KB)

View planholders list
Bidder's Summary (1129 KB)
Download plans and specifications
Print this project


RFP for Program Management\-Surface Water Distrib

The City of Turlock is seeking professional engineering and project management assistance to ensure construction of various drinking water system improvements are operational by early 2022

City Project Number: RFP_18-039
Bids Open: 8/31/2018 3:00 PM
Engineer's Estimate: $0.00
Cost of Plans and Specifications: $0.00
Technical Contact: Garner Reynolds
Contact Email: greynolds@turlock.ca.us

Addenda:

ADDENDUM NO. 1 (146.8 KB)

Supplemental Material:

Water master plan update 2009 (6523.4 KB)
West Yost Associates SRWA Phase 2 Scope fo Work (405.4 KB)
Integration study scope of work - Confluence Engineering (1645.9 KB)
TM sensitivity analysis (3925.4 KB)
TM local distribution improvements (1697.7 KB)
3500 N. Quincy appraisal - April 2017 (16932 KB)

View planholders list
Download plans and specifications
Print this project


SR-99/Fulkerth Road Interchange

The CITY OF TURLOCK invites separate sealed bids for Construction on State Highway 99 in Stanislaus County in Turlock from 0.4 mile south to 0.4 mile north of Fulkerth Road Undercrossing. The work consists of roadway reconstruction, including roadway and ramp widening and new traffic signals. The work includes earthwork, retaining walls, curbs, sidewalk, storm drainage, hot mix asphalt, pavement delineation, traffic signals, and highway lighting. Advertisement of the project begins on July 25, 2018. Bids will be received at the CITY OF TURLOCK, Development Services: Engineering Division, 156 S Broadway, Suite 150, Turlock, CA 95380, on August 29, 2018 until 2:00 p.m. local time and then opened at City Council Chambers publicly and read aloud. Complete the work within 290 working days. The estimated cost of the project is $9,400,000. No pre-bid meeting is scheduled for this project.

City Project Number: 0828
Bids Open: 8/29/2018 2:00 PM
Engineer's Estimate: $9,400,000.00
Contractor License Required: A
Cost of Plans and Specifications: $100.00
Technical Contact: Ryan Blais, P.E.
Contact Email: ryan.blais@ghd.com

Apparent Low Bidder: Agee Construction Corp.
Council Award Date: 10/5/2018

Addenda:

Addendum 1 (982.4 KB)
Addendum 2 (93.8 KB)

Supplemental Material:

1971 Fulkerth Road Undercrossing As-built Plans (4910.4 KB)
Initial Site Assessment (9655.1 KB)
Foundation Report (5479.8 KB)
Geotechnical Design Report (5016.5 KB)
Preliminary Stie Investigation Report (3518.2 KB)
Eathwork Cross Sections (4481.7 KB)

View planholders list
Bidder's Summary (1383 KB)
Download plans, specifications, and bid book
Print this project


RFP CM Services for SR-99/Fulkerth Interchange

The purpose of this Request for Proposals (RFP) is to seek proposals from qualified firms to provide construction management (CM) services, inspection and resident engineering services for City Project No. 0828, “SR-99/Fulkerth Road Interchange”. A general work description is as follows: Roadway widening and ramp reconstruction, including grading, paving, retaining wall, signs, traffic stripes, landscape and irrigation, highway lighting and traffic signal modifications. The current construction cost estimate, not including contingencies or construction engineering, is approximately $9,300,000. The plans and specifications are available at the City’s website: www.cityofturlock.org/capitalprojects/ The scope of work includes services prior to, during and after Construction. A Consultant Services Agreement will be executed for these services. It is the intent of the City to hire a consultant who will provide complete construction management including resident engineering, inspection and perform materials testing for the construction of the project with minimal support from City personnel.

City Project Number: 0828A
Bids Open: 8/22/2018 5:00 PM
Engineer's Estimate: $0.00
Contractor License Required: AEC
Cost of Plans and Specifications: $0.00
Technical Contact: Nathan Bray
Contact Email: nbray@turlock.ca.us

Addenda:

Addendum #1 (12436.3 KB)

View planholders list
Download specifications
Print this project


For more information or concerns about capital projects, please contact:

Engineering Division
156 S. Broadway, Ste. 150
Turlock, CA 95380
(209) 668-5520
engineering@turlock.ca.us
Monday - Friday, 8AM - 5PM




Million Acts of Kindness



Icons made by Freepik from www.flaticon.com is licensed by CC 3.0 BY



Top